Site Drainage and Pumping Station

This project involved the installation of new site drainage with a pumping station for Weavers Court Business Park in Belfast.

Works had to be carried out without disrupting the Business Park activities and carful co-ordination and programming was required while working on the ‘live site’.

Works carried out were as follows:

  • Installation of 140m of 450mmDIA combine sewer network with six 1350mmDIA manholes.
  • Re-build the existing outfall manhole.
  • Installation of a penstock gate to control the existing flows on-site.
  • Pipe re-lining of a existing section of the drainage network.
  • Installation of a 50l/s pumping station to allow flows from the site to be discharged to the public sewer.
  • Full permanent re-instatement throughout.
  • Protection slabs to shallow sections to suit the design.
  • DURATION

    10 Weeks
  • COMPLETION

    June 2015
  • VALUE

    £280,000