Electric CASE STUDIES

Electrical Main Cabling & Associated Civil Works

This project involved the upgrading of the mains electrical cabling as enabling works for £500m of investment over the next 5 years on new build properties and refurbishment of existing properties on the main QuB site.

Works carried out were as follows:

    • 450m of trenching between the Botanic Switchroom, Administration, Peter Froggatt, School of Music, Lynn Library and the Library Stack Buildings.
    • Reinstatement of asphalt, brick paving and granite slab areas.
    • Create buildings entry points.
    • Installation of new switchgear, cabling, commissioning and testing
    • Minor Additional Civil Works including:
      • Erection of vehicle bollards
      • Erection of a bicycle shelter

Challenges:

  • Over 4 weeks the works were carried out on a live site with 24 hour access required to pedestrians.
  • The buildings and car park were also in continuous use for the duration of the works.

 

  • DURATION

    4 Weeks
  • COMPLETION

    May 2014
  • VALUE

    £353,900.00

PROJECT GALLERY